MF-SG-01 · Revision A · Diamond Floor decorative surface system

Specifying Decora microcement

A continuous, hand-trowelled surface for considered interiors. Specify the complete build-up, from the existing substrate to the final protective sealer.

01Selection

Choose the finish

Diamond Floor is marketed as microcement. Its technical data sheet describes a single-component decorative finish based on modified polyurethane resins in water with graded aggregates. This guide addresses interior applications using the Decora Diamond system. [1, 2]

ApplicationSpecification approach
Interior floors and wallsSchedule the room, traffic, finish and complete system. Confirm substrate suitability before pricing.
Bathrooms and shower surfacesProject-specific assembly only. Coordinate waterproofing, falls, drainage, sealer and slip requirements before confirming use.
Joinery and benchtopsRequire a stable support, edge details and a sealed sample. Confirm exposure to water, heat, oils and cleaning products.
Stairs and landingsResolve nosings, edge protection, movement joints and the required slip performance with the designer.
Exterior, immersed or specialist useOutside this guide. Obtain a written system recommendation for the proposed exposure.

Set the visual benchmark

Specify colour, movement, texture and sheen through a physical sample. Require a larger site sample where raking light, a long wall or a broad uninterrupted floor makes variation important. Review the sealed finish under the intended lighting. Record acceptance before the main application.

A surface coating, not the structure

The decorative finish is a surface coating. The project must separately resolve structural movement, moisture management and any required waterproofing membrane.

02Preparation

Start with the substrate

Medida Forma proposes the following coordination requirements. The preparation method and component products must be confirmed for the actual substrate; acceptance of one area does not establish suitability elsewhere.

SubstratePreparation and acceptance
Concrete or cement screedReview curing, surface strength, moisture and contamination. Mechanically prepare where needed, repair defects and agree the primer and levelling method.
Existing ceramic or stone tilesSurvey bond and stability. Remove loose areas; resolve hollow tiles, grout lines and contamination. Agree a compatible bonding and levelling treatment before coating.
Sheeted walls and wet-area boardsObtain an approved board, framing, fixing and jointing detail. Confirm rigidity, fastener treatment and compatibility with the waterproofing and decorative layers.
Timber, plywood or framed floorsRequire specific written acceptance of the complete floor assembly. Resolve deflection and an approved overlay; do not coat moving boards directly.
Existing coatings or membranesIdentify each layer and obtain compatibility advice. Complete an adhesion trial where required. Resolve the membrane-to-finish interface in writing.
Joinery substratesProvide supported, stable construction with agreed corners and edges. Verify the proposed board and adhesive system for the intended exposure.

Before work starts

Record substrate acceptance, completed repairs, moisture results, joint locations and levels at adjoining finishes. Obtain approval of the system schedule and sample. Allocate responsibility for defects and preparation outside the agreed coating scope.

03System

Build the complete system

One continuous finish. Several coordinated layers.

  1. 01Protective sealerDecora Diamond Sealer in the published system
  2. 02Decorative finishDiamond Floor / Diamond Floor Fine as scheduled
  3. 03Preparation layerFloor Level and reinforcement where required
  4. 04Bonding treatmentDOC Primer or One Primer to suit the substrate
  5. 05Accepted substratePrepared concrete, masonry or other approved base

Manufacturer system concept, from exposed face to substrate. A project assembly may need additional layers. [1, 2]

Published referenceMeaning for specification
Diamond Floor finish thickness0.80 to 1.00 mm in the D021 data sheet; this excludes preparation, levelling and sealer. [1]
Application environmentD021 states +5 to +35 °C and relative humidity below 85%. Observe all component limits. [1]
System selectionThe manual identifies Floor or Floor Fine and a protective sealer. Final coat sequence and products require a project schedule. [2]

Joints, wet areas and sealers

Show movement joints through the finish and resolve changes of substrate, drainage outlets, waterstops and penetrations before application. Establish the required slip performance for the actual sealed finish. Record the test evidence, not a rating borrowed from another coating. Any alternative base coat or sealer requires documented compatibility and clear responsibility for the assembled system.

04Specification

Suggested specification clause

Copy into the project specification

Provide a complete Decora Diamond decorative surface system to the scheduled interior areas, installed by Medida Forma. Submit the substrate assessment, component schedule, current product data and a sealed physical sample before work. Include agreed preparation, bonding, levelling or reinforcement, decorative coats and protective sealer. Match the accepted sample for colour, texture, movement and sheen. Maintain designed movement joints and complete junctions to approved details. Coordinate wet-area waterproofing and slip requirements where applicable. Protect the finish through curing and provide care instructions at handover. Refer departures from the accepted system for written approval before substitution.

05Schedule

Project selection schedule

SelectionProject information
Finish code / locationProject finish code, room and surface extent
Colour / sampleSupplier colour reference and approved sample ID
Substrate / preparationExisting build-up, repairs and preparation responsibility
Base / decorative coatsNamed components, reinforcement and coat sequence
Sealer / sheenNamed product, coats, texture and compatibility acceptance
Levels / junctionsTotal build-up, transitions, joints and wet-area details
Performance / programmeRequired slip evidence, curing and protection periods
06Care and handover

Care, handover and warranty

Care

Use a neutral, non-abrasive cleaner and soft cleaning equipment. The Decora manual advises water no hotter than 40 °C and excludes steam cleaning, aggressive acids, strong alkalis and brushing machines. Remove spills promptly. [2] Where another sealer is approved, issue its care requirements with the handover documents.

Handover

Provide the final system schedule, colour and sample reference, batch records, approved details, applicable test reports and product warranties. State when foot traffic, coverings, cleaning and water exposure may begin. Agree suitable protection with the installer before other trades return. Record any future inspection or resealing recommendation against actual use.

Workmanship warranty

Medida Forma installations carry a 7-year workmanship warranty covering delamination and other installation defects, provided the issued care instructions are followed. Structural movement in the building is not covered. Manufacturer product warranties apply separately.

Performance evidence

This guide assigns no generic slip, fire, acoustic or waterproofing certification. Submit evidence for the actual assembly wherever the project requires it. Confirm current technical instructions before tender or construction issue; product sheets and manuals can use different consumption and drying references.

07Sources

Sources

  1. [1] Decora Diamond Floor D021 MTDS 021ENG, issued 1 September 2019; supplier-hosted copy.
  2. [2] Decora Diamond System Manual: system components, installation sequence and cleaning guidance.
  3. [3] Decora Diamond system overview: product family and current technical download links.

MF-SG-01 Revision A, 11 November 2026. This guide is not manufacturer certification or a project construction specification. Confirm current manufacturer instructions, and obtain evidence for the actual assembly, before tender or construction issue.