Guides

Is a microcement bathroom waterproof?

Not on its own. Microcement is the finish; a certified membrane underneath keeps water out. The layers in a Melbourne bathroom, in order, and who does each.

Walk-in shower in a seamless microcement bathroom

No. Microcement is a decorative finish, not waterproofing. In a microcement bathroom, the waterproofing is a certified membrane laid underneath it, and in our bathrooms that membrane covers the whole floor and every wall up to the ceiling before any microcement goes on.

Once sealed, microcement is water-resistant and has no grout lines for water to find. That is a real advantage in a shower. But water resistance in the surface is not the same as a waterproof barrier, and a microcement bathroom in Melbourne is only as good as the layers below it.

Why isn't microcement itself waterproofing?

Decora Diamond Floor, the microcement we use, is described in its technical data sheet as a single-component decorative finish based on modified polyurethane resins in water with graded aggregates. It is a surface coating, and the system is built to look and wear well, not to hold back water on its own.

Wet areas in Australia are governed by the National Construction Code, which points to AS 3740, the Australian standard for waterproofing internal wet areas. That standard is about the membrane system: where it goes, how junctions and penetrations are detailed, and how water is drained away. A finish on top, whether tile or microcement, sits outside that job.

So the honest answer to "is microcement waterproof?" is that the surface resists water and the membrane underneath stops it. You need both.

What goes under a microcement bathroom, layer by layer?

From the structure up, a microcement shower or bathroom is built in this order:

  1. A sound substrate with the falls already in it. Walls and floors must be structurally sound and stable, with wet-area grade linings. The floor falls to the waste are formed at this stage. Microcement is only 2 to 3 mm thick and follows the surface beneath, so it cannot correct a fall that isn't there.
  2. Surface preparation. The surface is cleaned back to a sound, dry base. Dust, laitance, old coatings and contaminants are ground off. Voids, cracks and undulations are filled with repair mortar, and leak-control flanges are rebated flush into the floor at the wastes.
  3. Primer. Matched to the surface: one for porous linings, one for non-porous fixtures, and a damp-tolerant primer where the substrate is green or damp.
  4. Junctions and penetrations. A bond-breaker band runs along every wall-to-floor junction and every shower wall-to-wall corner, so the membrane can move without tearing. Other joints and niches are sealed and bandaged. Pipes, taps and fixtures get collars or tape, and wastes get flanges.
  5. The membrane. We use the Gripset 2P cementitious membrane, applied in two coats at a minimum of 1.5 litres per square metre to build a 1.2 mm dry film. It is turned up and sealed at every penetration and returned into the wastes.
  6. Cure and certify. The membrane cures for as long as the manufacturer specifies for the conditions on site. That time varies with temperature, humidity and ventilation, so we build it into the programme rather than quote a fixed figure. The waterproofers who installed it sign a waterproofing certificate.
  7. Microcement. The decorative system goes on over the cured membrane: preparation and reinforcement where required, the base and finish coats troweled by hand, then the protective sealer.
  8. Movement joints. Movement joints are finished in silicone and carried through the microcement, so the surface moves with the building instead of cracking across it.

You can read the full method on our waterproofing page, which also links to the written specification we follow.

Why does the membrane have to be smooth?

Because microcement shows what is under it. At 2 to 3 mm, it follows every ridge and roller mark in the layer below. Under microcement the membrane is rolled or troweled to an even finish, free of undulations, so the walls and floor above sit flat. Under tiles, small ridges disappear into the adhesive bed. Under microcement they don't, which is one reason it matters who lays the membrane.

Who installs and certifies each layer?

The membrane is installed to the manufacturer's technical data sheet and the National Construction Code by qualified waterproofers, who sign the certificate handed to you or your builder. Keep it with your build records; a building surveyor may ask for it.

The microcement is applied by our own team. Because we do both, one studio answers for the whole build-up, from the membrane to the sealed surface. When the waterproofer and the finisher are different businesses, the junction between their two scopes is where problems tend to sit: a membrane laid rough, a cure period cut short, or a fall nobody checked.

How much of the bathroom is waterproofed?

The whole floor and every wall up to the ceiling, and the ceiling as well where the room calls for it. That goes beyond the minimum areas the Australian standard requires, which is why we sell it as a premium waterproofing package. In a microcement bathroom, where the same finish runs from the shower across the floor and up the walls, it makes sense for the protection to run just as far.

The same approach applies to showers, ensuites and laundries.

Why do the sealer and maintenance matter?

The sealer is what makes the microcement surface water-resistant and easy to clean, so it is part of how the bathroom performs, not a cosmetic extra. Day to day, clean with a neutral, non-abrasive cleaner and soft equipment. Decora's own guidance rules out steam cleaning, aggressive acids, strong alkalis and brushing machines, and recommends wiping spills up promptly. You receive written care instructions at handover, and following them is a condition of our 7-year workmanship warranty.

Is a microcement shower slippery?

Slip resistance depends on the actual sealed finish, not on microcement in general. For shower floors we specify a finish suited to bare feet and water, and for projects that need it, the slip evidence should come from a test of that finish, not a rating borrowed from another product. Ask us about the finish for your bathroom.

What does a microcement bathroom cost?

Microcement bathrooms start from $350/m² + GST, measured on the total area of floor and walls being coated. That covers the microcement installation only. Waterproofing is quoted separately, from $90/m² + GST on the total area treated. Our microcement pricing guide explains what moves those numbers. When comparing quotes, check that waterproofing is included, named and certified.

Where have we used it?

At Tombo Den in Windsor, the same textured microcement that wraps the Chapel Street facade carries inside onto the bathroom walls, giving the venue's bathrooms one continuous surface without joints. For more on the material itself, see Decora Diamond Floor and the waterproofing FAQ.

The short answer

Microcement makes a beautiful, seamless bathroom. The waterproofing is what makes it a bathroom that lasts: falls set first, a certified membrane over the whole room, then the finish on top. If you're planning one, tell us about the room and we'll walk you through the build-up for your space.